INSTALLATION OF SEWERAGE TREATMENT PLANT
Construction of Sewerage Treatment Plant at local coal mine – Project Value – $1.2M
Detailed design drawings to enable successful & most efficient dig plan ensuring tanks met correct RL’s & benching is as per site safety standards.
Service Required
- Installation of In ground tanks
- Installation of In ground pipes & electrical services & earth grids
- Concrete structures
- Structural steel structures
- Installation of tanks
- Connection of all pipe work
- Installation of all instruments
- Testing & commissioning of the plant